Recently, Chongqing Dianjiang Public Resource Trading Center issued an announcement confirming that Sanfeng Environment won the pre-bid for the county’s Waste-to-Energy project.
The total investment of the project is about 320 million yuan, with a franchise period of 30 years (including 2-year construction period), serving the entire country of Dianjiang. The project plans to build one Waste-to-Energy plant, which will be constructed in stages according to the increase in the amount of domestic waste incineration. In the first phase, a waste incineration line with a processing capacity of 400 tons/day and a 9MW condensing gas turbine generator set will be constructed, and a production line construction site of 400 tons/day will be reserved for the second phase. The project is also equipped with a kitchen waste treatment project, with a processing capacity of 60 tons/day.
Previously, the Henan Provincial Government Procurement Network issued an announcement confirming that the consortium including Sanfeng Environment and other 2 companies won the bid for Jiaozuo Vein Industrial Park east park project.
The total investment of the project is about 18.97 billion yuan, including Waste-to-Energy project, municipal sludge treatment project (co-processing), park sewage treatment project, park management center, transfer station and landfill closure. The Waste-to-Energy project has a processing scale of 2,000 tons/day, and is equipped with two 1,000 tons/day mechanical grate incinerators and one 50MW extraction-condensing steam turbine generator set, and the boiler adopts medium temperature and sub-high pressure parameters.
Address: 3 Jianqiao Avenue, Jianqiao Industrial Park, Dadukou District, Chongqing, China Tel:(+86) 8805 5666
Chongqing Sanfeng Environment Group Corp. Ltd. All Rights Reserved 渝ICP備50010402000216號(hào)